Wednesday, 15 February 2012

IOI mulls relisting of arm

(Published in the Star Biz headline on 13th Feb 2012)

By RISEN JAYASEELEN and DANIEL KHOO 

PETALING JAYA: IOI Corp Bhd is mulling a relisting of its property arm that would see the group unlock values in that segment and enhance the attractiveness of the parent company to investors as a more plantation-focused company, according to reliable sources.
“The group is in discussion with two investment banks on this to get feedback, especially on the right timing of the exercise,” said a source.
Analysts said the relisting of its property division would increase the stature of IOI Corp as a pure plantation play which would likely have higher valuations.
“It will reduce the conglomerate discount and transform IOI Corp into a pure plantation play, with a controlling stake in a valuable property company IOI Properties. Sole industry companies usually tend to fetch higher valuations,” an analyst with a local bank-backed research house said.
IOI Corp may wish to also time the relisting of its property arm in line with a more bullish view on the property sector.
In a sales note to its clients issued in January, Maybank IB said that potential downsides had already been priced into the property sector and that it did not discount the possibility of raising its call on the property sector from “neutral” to “overweight” in the medium to longer term as developers today were “backed by considerable unbilled sales, providing near-term earnings visibility.”
IOI Corp had privatised its arm in 2009. Then known as IOI Properties Bhd, IOI Corp had on Februuary 2009 launched a takeover offer at RM2.60 per share.
The takeover was successful and IOI Properties was subsequently delisted on April 28, 2009. It is today wholly-owned by IOI Corp. IOI Corp has been actively growing its property business since.
In January it acquired six acres of land in Singapore for RM995.5mil to build high-end condominums and will have to settle the entire amount to the government of Singapore within 90 days from the date of the tender acceptance letter.
Presently, it has seven projects which it is developing locally with estimated gross development values (GDVs) of almost RM20bil.
Properties can testify to its track record in building property projects that have sold well. Excluding the latest land buy in Singapore, it is also presently developing high-end projects in the southern neighbouring island state with GDVs close to RM6bil.
IOI Properties has completed property development projects in Puchong, Putrajaya, southern Johor and Singapore before.
Meanwhile, banking sources also said that IOI Corp was in talks with banks to raise more funds.
“It is in a good position to do so, considering its huge cash flows from its plantation side of the business,” said one banker.
The funds raised should give IOI Corp sufficient funds to not only pay for the Singapore land acquisition but also ready funds in the event it chooses to buy more assets such as plantation land.
Based on its results for the first quarter ended Sept 30, 2011, IOI Corp had total short and long-term borrowings of RM688.24mil and RM4.87bil respectively. Most of these debts are denominated in the US dollar, the Singapore dollar and the yen.
IOI Corp had cash and cash equivalents of RM3.22bil as at Sept 30, 2011.

Award of all LRT extension jobs by H1

(Published in the Star Biz 13th Feb 2012, page 5)


PETALING JAYA: Syarikat Prasarana Negara Bhd hopes to award all LRT Line Extension contracts by the first half of 2012.
Group director for project development Zulkifli Mohd Yusoff said the entire project consisting of the Kelana Jaya line and the Ampang line had between 40 and 50 contracts.
To date, about 80% to 90% had been awarded while only two stations and the main depot for the Ampang line were still undergoing the process of tendering, he told reporters here yesterday.
According to Zulkifli, the total value of contracts that have been awarded for both lines currently stood at RM4.5bil.
For the supply of 20 trains for the Ampang line, estimated to be worth RM1bil, the company was evaluating seven supply submissions, Zulkifli said.
The other system contract yet to be awarded was for electrical and mechanical system works, he said.
“The system side involves installing power supply, track work, signalling and so on. 
Bernama.

Tuesday, 14 February 2012

IWH to be master developer

(Published in the Star Biz 10th Feb 2012, page 2)
PROJECT WILL COVER DANGA BAY IN THE WEST AND TEBRAU IN THE EAST


THE word “kang” (pronounced as chiang in Mandarin) means straits and “hoo” or “her” means river and somehow Datuk Lim Kang Hoo is fated to be digging rivers. He has spent close to a decade digging up the three rivers that converge to become a waterfront city as part of the Danga Bay project.
He explained that it has been one exhausting process to clear layers of mud and sludge and tonnes of rubbish but today many appreciate the serenity of a park that has been developed nearby, a bay area for yacht as well as commercial and residential areas in Danga Bay. The job is far from over and detractors have questioned why the entire redevelopment of the area was taking so long. Lim is also at the centre of a recently-announced consolidation exercise where a vehicle called Iskandar Waterfront Holdings Bhd (IWH) will become the owner of all major property development spanning the east to west of the waterfront of Johor Baru city. Lim, through his vehicle Credence Resources Sdn Bhd, will have 60% of this vehicle with the balance 40% to be held by the Johor state, in a pioneering private public partnership attempt. Their goal: transform the entire southern tip of Johor Baru into a waterfront city that would be remembered for decades. But would it work?
StarBiz deputy news editor B.K. Sidhu spoke to Lim in his office in Danga Bay yesterday. Below are excerpts of the interview:
StarBiz: What was the rationale for IWH buying a stake in Tebrau Teguh Bhd?
Lim: As you know, we have been developing Danga Bay since the 1998/99 economic crisis. Then we saw it as an opportunity as the location was good for an integrated waterfront city though there were heaps of rubbish and sludge that we had to clear before we could build anything. To be frank, it was worse than the Gombak river. And until today we are still digging and cleaning and in all, we also had to reclaim land to create what we had in mind.
The Danga Bay area is next to the Iskandar Corridor, which is on the west side of Johor Baru, but in order to expand to the east to complete the loop, we needed to work with someone else. We also needed to expand into the east for the lifestyle portion.
In the middle is the central business district (CBD) development which will be turned into a heritage city to attract international tourists. So with Tebrau, we would have a complete strip spanning from west to east. It is a big task but we are very grateful that the state government is supporting the entire Iskandar development master plan and we have formed a public-private partnership to develop the whole area.
It is such a huge development that would benefit the local community and the developers.
There is a perception that KPRJ is selling its state-owned assets to private parties like yourself.
The Johor state government is not selling out. It is just consolidating its interest into the holding company. This is a private-public partnership. I am also injecting my own assets into IWH.
Would Tebrau remain listed?
It would, and we like to keep it like this.
Why did Kumpulan Prasarana Rakyat Johor choose to work with you?
We have proven ourselves in understanding and undertaking water development projects and we have never run away from any job from the day we proposed it despite the challenges. What we are doing is planning and building for our future generations.
Actually, I am a very bad businessman as I am still with the project. Many other property developers would have made so many houses and sold them during this time but I am still working on this project.
Would IWH be listed?
One day, we are still preparing. It would be listed.
You talked about being master developer and to get investors to develop parcels, are they coming?
We have some, such as Dijaya Corp, the Azea Group of Singapore, Waz Lian Group and also Australia's Walker Group. They are all undertaking some development on our landbank. We are aggressively going out to attract investors. That is also why we are consolidating the landbank under one holding company. With the new structure, people will know who we are.
Some property developers think we are their competitor, but we are not. We are not doing townships, we are a master developer and we want to work with local and foreign developers. They are our clients and by undertaking the Danga Bay project we wanted to show them that it could be done. We had to take the lead and invest first.
Since last year we are getting a lot of enquires after the two governments (Malaysia and Singapore), resolved the POA agreement, and every day there are several parties coming to take a look at our landbank with a view for investment.
You have been on the Danga Bay project for a long time and some people think you have not lived up to expectations.
The first thing we have to do is to clean up the area and that took a long time because it is not easy getting the mud, sludge and rubbish out.
We have thus far completed the entire infrastructure and while you may say that we have taken a long time, the real rush to grab land in Johor is only happening now.
Today, we have created a park, some commercial and residential units, a yacht bay and more development is coming up. Ours are long-term projects and it may take up to the next generation to complete all that we have designed.
What we like to see is a waterfront like that of Sydney Harbour or even Hong Kong.
This is why the Government agreed to form a private-public partnership with us. As for infrastructure, there is now a six-lane highway connection from two-lane previously.
Did you get the land for Danga Bay free from the Government?
Never, the land is not given to us, we bought it over with its liabilities.
When did the actual work for Danga Bay begin?
It only began in 1999 and the infrastructure and cleaning has cost us RM280mil while the residential and commercial gross development value is about RM400mil.
When do you expect the full completion of Danga Bay?
The urban planning design is for 2,000 acres. It is a long-term development ... there are many phases. We are the master developer and we need developers and investors to come in to develop parts of the land and it would take a long time; maybe the full completion would not be in my lifetime.
What is the property market outlook in Johor?
It is only since the end of 2011 that we are seeing large numbers of local and foreign developers rushing to invest in JB.
This is something we have not seen in the last 15 years. Today we see the big, medium and small developers in town. That is a good sign as people are rushing to buy up land for future development.
Property prices from housing to land prices are gradually going up and all these investors that are coming in are the early birds. We have not seen the real big boom in the property sector.
Is the land bank under-valued?
It is still an early bird price when compared with prices in Singapore and Kuala Lumpur. There is still room for improvement and we believe more investors and developers will come in.
What is delaying the waterfront projects?
If you look at history, all water front cities have a history of 100 to 200 years. We have just started and to see the transformation it may take generations. But somebody has to start it.
How will Ekovest benefit from this development in JB?
Ekovest is very focused on design, construction and building infrastructure projects. Obviously with Iskandar, which is a huge project, there are plenty of opportunities to participate in the building of infrastructure. Of course like everything else, there is a tender process, it would be an open tender basis where everyone can participate and Ekovest can be one of them.
You are said to be close to the Johor Sultan.
Like any businessman, we have friends all over and whoever is the leader, we need to know and respect them.
Are you also involved in the Tanjung Piai project?
I have nothing to do with that project.
Once upon a time you were linked to buying Kulim. Was there any interest at all?
How can I take over a company as big as Kulim? If it belongs to me, I would be very happy.
As a master developer, where is the entire financing coming from?
That is why we need investors, local and foreign, to invest in it. It can be PNB, EPF or any developer that wants to be part of the project.
How did you start?
I have been in business for 40 years and started from doing small renovations to big renovations. I was also involved in plantations with Felda and from there we just learn and moved on. Slowly, we started getting bigger contracts and everything just got bigger. But it did not come easy, it has been a lot of hardwork and years of experience.
We did jobs everywhere from Lahat Datu to Pahang and Kuala Lumpur to Johor. Nowadays I spend about 70% to 80% of my time here in Johore. Once you have a vision, you have to look towards achieving it.

Monday, 13 February 2012

Coastline Makeover

(Published as headline in Star Biz 10th Feb 2012)

Johor in RM80bil joint venture with Lim to build waterfront city

JOHOR BARU: Johor Baru's coastline fronting Singapore is in for a major transformation that will have a gross development value (GDV) of some RM80bil and led by a joint venture between the Johor state and businessman Datuk Lim Kang Hoo.
A new vehicle called Iskandar Waterfront Holdings Bhd (IWH) is being created and it would be injected with massive landbank hitherto mainly owned by the Johor state and Lim. As a result of these injections, Lim would have 60% of IWH while the Johor state, through its vehicle Kumpulan Prasarana Rakyat Johor (KPRJ), would hold the remaining 40%.
The straight-talking Lim, who granted StarBiz an interview after numerous calls were made to his office, also didn't rule out the listing of IWH.
“We are still preparing for it ... One day it will be listed,” he said at his modest office in downtown Johor Baru.
He said the development would be undertaken over several years and would become a major economic engine of growth for the state.
IWH will oversee the development of the valuable landbank stretching 3,000 acres from west to east of southern Johor Baru to be transformed into an integrated waterfront city.
One of the assets being acquired by IWH was a 33.15% stake in Tebrau Teguh Bhd held by KPRJ. This led to concerns that the state was hiving off its assets to Lim.
“It's a misperception. This is a consolidation exercise to put all the landbank into the holding company. In the end, what KPRJ will have is joint ownership of a much larger pie than what it had before,” he said.
“We and KPRJ are the master developers and we will take charge of the development of Danga Bay, Iskandar Waterfront, Tebrau Coast and the central business district development in Johor.
“To have a project of this size, the need for a strategic partnership with the state is necessary,” Lim said.
The entire waterfront project is part of flagship A of the massive Iskandar Malaysia development, which is spearheaded by Khazanah Nasional Bhd.
“The partnership we have entered into is driven to enhance the development of the southern tip of Johor which is the gateway to Malaysia from Singapore,” Lim said.
A key component of the project is for IWH to attract established world class developers to undertake different parcels. These parties are also expected to part fund the entire development, bringing in the much needed foreign direct investment, said Lim.
“We are aggressively trying to attract more local and foreign developers to invest in Johor. We are not into building townships but we want property developers to be our clients to develop the landbank we have,” he said.
The company has attracted developers such as Dijaya Corp Bhd, Singapore's Azea Residences, Plazzo Hotels & Service, Waz Lian Group, Tune Hotel and Australia's Walker Group.
It has been reported that Dijaya has committed to invest RM3.8bil to build a high-end mixed development while Singapore's Azea Residences will work on four blocks of high-end apartments at a cost of over RM500mil. Australia's Walker Group has also partnered with IWH to develop Senibong Cove into a high-end residential development modelled after the Hope Island project in Australia's Gold Coast.
Lim said the project had received enquiries almost on a daily basis from both local and foreign developers.
“The interest level we see now is nothing like what we have seen in the past 15 years. We are swamped with serious enquiries and over the past year we have seen every developer from Malaysia going to Johor Baru and also some very big names from abroad,” he said.

Sunday, 12 February 2012

Prasarana has big plans for Dang Wangi

Patrick Lee
 | February 12, 2012
Under the rail-plus-propert scheme, the areas surrounding the Dang Wangi station would be developed for commercial or residential purposes.


PETALING JAYA: Malaysia’s first attempt at a rail-plus-property model will take place in Dang Wangi, Kuala Lumpur.

National transport company Prasarana chief Zulkifli Mohd Yusoff said the company was already finishing up its plans to develop the station, located along the Kelana Jaya line.
“Dang Wangi is probably going to be the first rail-plus-property that we’re going to do near Wisma Denmark… that’s where we’re going to have our first-rail-plus property.”
“We were already looking at it with our station at Dang Wangi and we are in the midst of finalising our joint-venture agreement with a particular developer,” he told reporters here today.
However, Zulkifli, the project development group director, declined to elaborate on the details of the project, or the developer involved.
A rail-plus-property model is a scheme where the area surrounding a railway station would be developed for commercial or residential purposes.
An example of this scheme can be seen in Hong Kong’s MTR Corporation (Mass Transit Railway).
This model would be expected to minimise costs on public transport infrastructure, keeping a rail operator’s fares affordable in the process.
For this reason, the model has been suggested by by the government for the upcoming My Rapid Transit (MRT) lines to cover its costs.
Today, Zulkifli said Prasarana was also looking at the model for stations located along the Light Rail Transit (LRT) extension lines, including the Kelana Jaya and Ampang lines.
One example, he said, was at a stop currently known as “Station 2″ on the extended Kelana Jaya line, along Jalan Lapangan Terbang Subang.
“Planning is on the way to have property development… and this can be in the form of commercial areas or a mix (such as) commercial and residential.”
“One area where we’re looking at is Station 2… just beside the old airport road, (which is now) called Ara Damansara… That is one area where we feel has a potential for property development at our station,” he said.
Major works started
Speaking on the actual LRT extension itself, Zulkifli said that “90%” of the contracts or “40 to 50″ of them assigned to the project have been awarded thus far.
Announced last year that it would not cost more than RM7 billion to build, the Prasarana head said that major works on the project had already started.
With “20%” of the project already completed, Zulkifli said that more than RM6.5 billion worth of contracts had been awarded thus far.
This included roughly RM2 billion for the Ampang Line; RM2.5 billion for Kelana Jaya Line; RM1billion for 20 Ampang Line trains; and RM1 billion for system works (including signalling and telecommunication).
Prasarana added that ninety percent of the land needed for the project had been acquired, and that the last 10% “was being done”.
However, Zulkifli said that this last bit of land acquisition would not affect the project’s total completion by the end of 2014.
The 17.7-km Ampang Line extension is expected to be opened to the public by October 2014, with the Kelana Jaya Line following in December 2014, with 13 stations each.
Both lines will continue from their current stops at Sri Petaling (Ampang Line) and Kelana Jaya and terminate at Putra Heights.

Some Jalan Sultan landowners want written guarantee from MRT Corp

February 12, 2012
http://www.themalaysianinsider.com/malaysia/article/some-jalan-sultan-landowners-want-written-guarantee-from-mrt-corp/

Tuesday, 7 February 2012

Retail space challenge

(Published in the Star BizWeek, 28th Jan 2012 page 20)

By EUGENE MAHALINGAM

Growth of retail sector depends on balance in demand and supply of retail space
IT might be the year of the dragon – a Chinese astrological symbol that is said to be synonymous with power and good fortune – but for property developers of new shopping malls in the country, the ongoing uncertainty in the global economy and oversupply of retail space might just douse their burning business plans.
According to Henry Butcher Retail managing director Tan Hai Hsin, about 10 new shopping malls are expected to be opened this year in the Klang Valley alone.
“The total retail space for Klang Valley in 2011 was more than 52 million sq ft. For this year, it is expected to increase by at least 3.5 million sq ft, he tells StarBizWeek.
“This sub-sector is growing, based on the number of new shopping centres that will be completed. However, it will be a challenge to fill up all the retail shops upon opening. It will take them at least a year to do so.”
Tan says the growth of this sub-sector is highly dependent on consumers’ spending power this year.
Khong & Jaafar Sdn Bhd managing director Elvin Fernandez points out that this sub-sector was relatively strong in 2011 and will likely continue to be strong based on continued robust consumer spending and support from tourism spending.
“Despite the global turmoil, consumer spending has not slowed down. Oversupply for the retail sector is usually less of a concern because owners or developers usually do a lot of pre-development research and planning before bringing a shopping centre into the market.
“However, it is still important for more information flow through the media to ensure that the numbers hitting the market are known by all – investors, developers, regulators and the general public and this critical flow of information in itself helps to balance supply and demand.”
Elvin says that there are “shadows of looming oversupply” in the next two to five years as more of the bigger property projects, many of them under the Economic Transformation Programme (ETP), get under way.
“Lenders and regulators should continuously insist on detailed market and feasibility studies and updates of those studies from time to time and not dispense with them for reasons of cost.
“They must also be perused by the user of the reports and not done just as a matter to satisfy compliance,” he says.
Elvin adds that in the retail industry, a shopping centre maintains its attractiveness by sustained astute mall management over a long period of time.
“Location is important but it is not everything. Mall management is more important. Positioning the mall, (having) the right tenant mix and the myriad of small details count in drawing shoppers in.”
Tan reckons that the success of a shopping mall is not location-specific but, project-specific.
“For example, Suria KLCC, Mid Valley Megamall, Pavilion KL, Plaza Sungei Wang, Berjaya Times Square, One Utama, Sunway Pyramid and a few more will remain as popular shopping centres in Klang Valley.
“At the same time, shopping centres that have been suffering from low shopping traffic will continue to face challenges in attracting crowds,” he says.
Tan says that there is still a clear disparity between success and failure.
“Popular shopping centres throughout the country continue to attract shoppers and quality tenants despite intense retail competition and weak economy. On the other hand, poorly occupied shopping centres continue to suffer.
“Last year, some shopping centres were giving long rent-free period to their retailers,” he says.
According to Tan, average rental growth for Klang Valley shopping-centre market should be not more than 5% this year.
“Average occupancy rate for Klang Valley shopping centres should remain at around 85%,” he says.
Elvin says the continued economic growth will underlie the growth of the retail sector.
“Will the global economy sink further? The European sovereign debt crisis continues and there is sluggish economic growth in the US despite a prolonged period of pump-priming.
“Will China and India slow down, although inflation in both countries is abating, which will allow them to stimulate further their economies.
Elvin notes that with Malaysia being an open economy and dependent on exports, he says that “it would not look good for us” if the global economy does not recover.
“The economy will have knock-on effects on the property market and may affect consumer spending.
“The authorities are also trying to slow or bring down household debt and this may crimp to an extent consumer spending. On the positive side, the rollout of the ETP projects may add buoyancy to consumer spending and this may also be an election year, which usually results in increased activity and spending.”
Tan concurs that the unresolved eurozone debt crisis, the potential US double dip recession and the recent decline in China export market will affect the Malaysian economy in 2012.
“When export-oriented manufacturing sector slows down due to low external demand, it will affect local employment market. Some Malaysians may be out of jobs this year, many will not get salary increments and graduates will not be able to find jobs. All these will affect retail spending.
“In addition, the uncertain world economy will indirectly lead to Malaysian consumers being cautious in their spending because they are worrying about their future job prospects. They will wait for a sale before they buy. They will look out for value-for-money promotions.”
Tan notes however that the 1.2 million government servants that were given salary increment and bonus recently will boost consumer spending.
“RM100 cash for the purchase of school books and related items has been given out to each student from standard one to form five in Malaysia. A one-off RM500 has also been given out in phases to families with income of less than RM3,000 per month.
“These will boost retail spending to a certain extent this year.”
According to the Valuation and Property Services Department’s Property Market Report for the first half of 2011, the retail market recorded substantially increased take-up space of 258,462 sq meters during the period.
All states except Kelantan recorded positive take-up, with Kuala Lumpur leading the take-up with 54,653 sq meters.
“As at end-June 2011, the country has nearly 2.05 million sq meters of space available for occupation,” the report said.
On the construction front, there were 15 completions in the first half of 2011 with 191,078 sq meters of new retail space entering the market, bringing up the country’s total existing space to 10.78 million sq meters.
The report also said rentals in shopping complexes in most states were generally stable in the first half of 2011.
It said rentals of retail space of shopping complexes in Kuala Lumpur were largely stable with isolated movements recorded in few buildings.
“Suria KLCC obtained premium rentals at RM592 to RM753 per sq meter for its lower ground floor units while retail units in KL Pavilion breached more than RM1,000 per sq meter.
“Bukit Bintang Plaza recorded a double digit increase of 11.5% for its ground floor units but those in the lower ground and second floor recorded slight decreases of 3.6% and 3.0% respectively.”
In Selangor, it was disclosed that rentals of retail space in shopping complexes were also stable with increases recorded in selected buildings.
“The Curve saw the rental of its ground and first floor units increased by 12.4% to 36.6% due to rental review, with rentals ranging from RM79.11 per sq meter to RM114.74 per sq meter.
“Rental in AEON Taman Equine recorded gains of 4.5% to 11.8% while AEON Bukit Tinggi in Klang saw higher gains of 7.6% to 40.0% in the review period. However, there were slight declines of 2.8% to 3.6% in the latter for its second floor units,” said the report.